Carver County Highway Department

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

108366 (SP 010-611-006) - NEW CSAH 11 CORRIDOR - GUERNSEY AVEDuininck, Inc. Mathiowetz Construction Company Rud Excavating 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$180,000.00$180,000.00$344,716.00$344,716.00$170,000.00$170,000.00
2031.501FIELD OFFICE TYPE DEACH1$9,750.00$9,750.00$20,000.00$20,000.00$15,000.00$15,000.00
2041.610TRAINEESHOUR1,200$1.00$1,200.00$1.00$1,200.00$1.00$1,200.00
2101.501CLEARINGACRE4.4$4,000.00$17,600.00$4,000.00$17,600.00$4,200.00$18,480.00
2101.502CLEARINGTREE46$1,150.00$52,900.00$100.00$4,600.00$160.00$7,360.00
2101.506GRUBBINGACRE4.4$1,500.00$6,600.00$900.00$3,960.00$1,600.00$7,040.00
2101.507GRUBBINGTREE46$100.00$4,600.00$100.00$4,600.00$105.00$4,830.00
2102.502PAVEMENT MARKING REMOVAL-PERMANENTL F1,750$0.75$1,312.50$0.75$1,312.50$0.65$1,137.50
2104.501REMOVE FENCEL F2,841$2.50$7,102.50$1.00$2,841.00$5.25$14,915.25
2104.501REMOVE METAL CULVERTL F578$6.00$3,468.00$6.00$3,468.00$10.00$5,780.00
2104.501REMOVE CONCRETE CULVERTL F50$8.00$400.00$8.00$400.00$20.00$1,000.00
2104.509REMOVE MAIL BOX SUPPORTEACH5$22.00$110.00$40.00$200.00$27.00$135.00
2104.509REMOVE SIGN TYPE CEACH15$30.00$450.00$30.00$450.00$27.00$405.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)L F272$3.00$816.00$3.00$816.00$7.00$1,904.00
2105.501COMMON EXCAVATION (P)C Y286,652$6.10$1,748,577.20$7.00$2,006,564.00$12.50$3,583,150.00
2105.505MUCK EXCAVATIONC Y51,418$9.00$462,762.00$7.00$359,926.00$12.50$642,725.00
2105.522SELECT GRANULAR BORROW (CV)C Y50,468$11.69$589,970.92$13.75$693,935.00$14.00$706,552.00
2105.604GEOTEXTILE FABRIC TYPE IS Y4,040$1.60$6,464.00$1.85$7,474.00$4.00$16,160.00
2105.604GEOTEXTILE FABRIC TYPE VS Y18,910$1.40$26,474.00$1.75$33,092.50$2.00$37,820.00
2105.607TOPSOIL BORROW SPECIAL 1 (CV)C Y3,601$45.00$162,045.00$35.00$126,035.00$20.00$72,020.00
2123.5074.0 CU YD SHOVELHOUR20$200.00$4,000.00$175.00$3,500.00$190.00$3,800.00
2123.509DOZERHOUR20$140.00$2,800.00$175.00$3,500.00$185.00$3,700.00
2123.6101.5 CU YD BACKHOEHOUR20$200.00$4,000.00$150.00$3,000.00$175.00$3,500.00
2123.610STREET SWEEPER (WITH PICKUP BROOM)HOUR30$225.00$6,750.00$175.00$5,250.00$150.00$4,500.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)C Y22,252$20.09$447,042.68$19.50$433,914.00$20.00$445,040.00
2331.604BITUMINOUS PAVEMENT RECLAMATION (P)S Y29,254$5.71$167,040.34$5.10$149,195.40$2.05$59,970.70
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL6,343$2.90$18,394.70$2.50$15,857.50$3.05$19,346.15
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,F)TON8,738$64.17$560,717.46$62.25$543,940.50$66.22$578,630.36
2360.502TYPE SP 12.5 NON WEAR COURSE MIX (3,B)TON7,587$54.49$413,415.63$54.75$415,388.25$56.06$425,327.22
2412.51112X6 PRECAST CONCRETE BOX CULVERTL F336$810.00$272,160.00$779.00$261,744.00$920.00$309,120.00
2412.51212X6 PRECAST CONCRETE BOX CULV END SECTEACH4$11,500.00$46,000.00$10,077.00$40,308.00$13,000.00$52,000.00
2451.511COARSE FILTER AGGREGATE (CV)C Y1,300$30.00$39,000.00$41.00$53,300.00$40.00$52,000.00
2501.51130" CS PIPE CULVERTL F45$50.00$2,250.00$47.00$2,115.00$58.00$2,610.00
2501.51118" CS PIPE CULVERTL F340$30.00$10,200.00$25.00$8,500.00$35.00$11,900.00
2501.52128" SPAN CS PIPE-ARCH CULVERTL F36$40.00$1,440.00$35.00$1,260.00$50.00$1,800.00
2501.52122" SPAN RC PIPE-ARCH CULV CL IIAL F44$68.00$2,992.00$50.00$2,200.00$48.00$2,112.00
2501.52136" SPAN RC PIPE-ARCH CULV CL IIAL F265$104.00$27,560.00$82.00$21,730.00$69.00$18,285.00
2501.52128" SPAN RC PIPE-ARCH CULV CL IIAL F19$83.00$1,577.00$63.00$1,197.00$104.00$1,976.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH1$516.00$516.00$313.00$313.00$600.00$600.00
2501.52536" SPAN RC PIPE-ARCH APRONEACH3$850.00$2,550.00$534.00$1,602.00$810.00$2,430.00
2501.56730" CS SAFETY APR & GRATE DES 3148EACH1$1,300.00$1,300.00$1,052.00$1,052.00$2,000.00$2,000.00
2501.56948" RC SAFETY APRONEACH2$1,175.00$2,350.00$1,718.00$3,436.00$1,800.00$3,600.00
2501.56930" CS SAFETY APRONEACH1$585.00$585.00$401.00$401.00$2,300.00$2,300.00
2501.56924" RC SAFETY APRONEACH8$460.00$3,680.00$380.00$3,040.00$760.00$6,080.00
2501.56918" CS SAFETY APRONEACH14$320.00$4,480.00$221.00$3,094.00$890.00$12,460.00
2501.56918" RC SAFETY APRONEACH9$375.00$3,375.00$328.00$2,952.00$660.00$5,940.00
2501.56912" RC SAFETY APRONEACH4$325.00$1,300.00$257.00$1,028.00$600.00$2,400.00
2501.56915" RC SAFETY APRONEACH8$360.00$2,880.00$297.00$2,376.00$600.00$4,800.00
2501.56928" SPAN CS SAFETY APRONEACH2$530.00$1,060.00$338.00$676.00$1,700.00$3,400.00
2501.56936" RC SAFETY APRONEACH2$830.00$1,660.00$724.00$1,448.00$1,200.00$2,400.00
2501.56930" RC SAFETY APRONEACH9$600.00$5,400.00$493.00$4,437.00$790.00$7,110.00
2502.5014" PRECAST CONCRETE HEADWALLEACH2$300.00$600.00$225.00$450.00$300.00$600.00
2502.5418" PERF PE PIPE DRAINL F313$14.00$4,382.00$8.25$2,582.25$13.00$4,069.00
2502.5414" PERF PE PIPE DRAINL F1,442$10.00$14,420.00$8.00$11,536.00$9.00$12,978.00
2502.5416" PERF PE PIPE DRAINL F8,777$12.00$105,324.00$6.25$54,856.25$11.00$96,547.00
2503.54115" RC PIPE SEWER DES 3006 CL VL F284$44.00$12,496.00$34.50$9,798.00$31.00$8,804.00
2503.54136" RC PIPE SEWER DES 3006 CL IIIL F112$100.00$11,200.00$70.00$7,840.00$70.00$7,840.00
2503.54118" RC PIPE SEWER DES 3006 CL IIIL F926$49.00$45,374.00$35.00$32,410.00$35.00$32,410.00
2503.54124" RC PIPE SEWER DES 3006 CL IIIL F986$57.00$56,202.00$41.50$40,919.00$39.00$38,454.00
2503.54112" RC PIPE SEWER DES 3006 CL VL F454$41.00$18,614.00$31.00$14,074.00$29.00$13,166.00
2503.54148" RC PIPE SEWER DES 3006 CL VL F219$185.00$40,515.00$139.00$30,441.00$144.00$31,536.00
2503.54130" RC PIPE SEWER DES 3006 CL IIIL F516$72.00$37,152.00$57.50$29,670.00$56.00$28,896.00
2506.501CONST DRAINAGE STRUCTURE DESIGN SPEC 3L F6.8$375.00$2,550.00$270.00$1,836.00$420.00$2,856.00
2506.501CONST DRAINAGE STRUCTURE DESIGN SPEC 2L F146.3$195.00$28,528.50$250.00$36,575.00$252.00$36,867.60
2506.501CONST DRAINAGE STRUCTURE DESIGN SPEC 4L F37.3$425.00$15,852.50$469.00$17,493.70$462.00$17,232.60
2506.501CONST DRAINAGE STRUCTURE DESIGN SPEC 1L F19.9$310.00$6,169.00$193.00$3,840.70$305.00$6,069.50
2506.516CASTING ASSEMBLYEACH40$565.00$22,600.00$573.00$22,920.00$650.00$26,000.00
2506.522ADJUST FRAME & RING CASTINGEACH7$350.00$2,450.00$400.00$2,800.00$200.00$1,400.00
2506.602CONST DRAINAGE STRUCTURE DESIGN SPEC 5EACH1$6,000.00$6,000.00$6,021.00$6,021.00$6,200.00$6,200.00
2506.602CONST DRAINAGE STRUCTURE DESIGN SPEC 6EACH1$6,000.00$6,000.00$5,911.00$5,911.00$6,200.00$6,200.00
2511.501RANDOM RIPRAP CLASS IIIC Y134.3$68.00$9,132.40$72.00$9,669.60$67.00$8,998.10
2511.501RANDOM RIPRAP CLASS IIC Y195$68.00$13,260.00$72.00$14,040.00$67.00$13,065.00
2521.5016" CONCRETE WALKS F320$5.00$1,600.00$5.15$1,648.00$9.40$3,008.00
2521.5113" BITUMINOUS WALKS F105,593$1.65$174,228.45$1.66$175,284.38$1.70$179,508.10
2531.501CONCRETE CURB & GUTTER DESIGN D424L F1,649$22.00$36,278.00$12.40$20,447.60$19.50$32,155.50
2531.501CONCRETE CURB & GUTTER DESIGN B424L F225$28.00$6,300.00$14.00$3,150.00$21.60$4,860.00
2531.618TRUNCATED DOMESS F96$35.00$3,360.00$48.00$4,608.00$38.50$3,696.00
2540.602INSTALL MAIL BOX SUPPORTEACH5$113.00$565.00$125.00$625.00$200.00$1,000.00
2550.5231.25" NON-METALLIC CONDUITL F21,200$3.10$65,720.00$3.10$65,720.00$3.25$68,900.00
2550.602PULL VAULTEACH5$1,810.00$9,050.00$1,810.00$9,050.00$1,900.00$9,500.00
2554.509GUIDE POST TYPE BEACH36$65.00$2,340.00$65.00$2,340.00$65.00$2,340.00
2563.601DETOUR SIGNINGLS1$4,200.00$4,200.00$4,200.00$4,200.00$8,400.00$8,400.00
2563.601TRAFFIC CONTROLLS1$5,000.00$5,000.00$5,000.00$5,000.00$12,600.00$12,600.00
2565.616TEMPORARY SIGNAL SYSTEMSYS1$120,000.00$120,000.00$119,110.00$119,110.00$125,000.00$125,000.00
2573.502SILT FENCE, TYPE MACHINE SLICEDL F16,765$1.60$26,824.00$1.40$23,471.00$1.85$31,015.25
2573.505FLOTATION SILT CURTAIN TYPE STILL WATERL F200$15.00$3,000.00$6.00$1,200.00$10.00$2,000.00
2573.512TEMPORARY DITCH CHECK TYPE 3L F660$5.00$3,300.00$3.50$2,310.00$3.20$2,112.00
2573.520SEDIMENT REMOVAL BACKHOEHOUR20$250.00$5,000.00$200.00$4,000.00$150.00$3,000.00
2573.530STORM DRAIN INLET PROTECTIONEACH33$200.00$6,600.00$250.00$8,250.00$100.00$3,300.00
2573.540FILTER LOG TYPE STRAW BIOROLLL F2,094$4.00$8,376.00$3.00$6,282.00$2.65$5,549.10
2573.550EROSION CONTROL SUPERVISORLS1$15,000.00$15,000.00$5,000.00$5,000.00$1.00$1.00
2573.602TEMPORARY ROCK CONSTRUCTION ENTRANCEEACH2$1,500.00$3,000.00$2,000.00$4,000.00$500.00$1,000.00
2575.501SEEDINGACRE42.4$100.00$4,240.00$100.00$4,240.00$79.00$3,349.60
2575.502SEED MIXTURE 350LB688$6.50$4,472.00$4.30$2,958.40$4.75$3,268.00
2575.502SEED MIXTURE 250LB2,065$3.00$6,195.00$2.75$5,678.75$1.90$3,923.50
2575.502SEED MIXTURE 150LB1,034$3.00$3,102.00$3.05$3,153.70$1.90$1,964.60
2575.505SODDING TYPE EROSIONS Y3,207$4.00$12,828.00$3.00$9,621.00$4.75$15,233.25
2575.511MULCH MATERIAL TYPE 1TON101$300.00$30,300.00$100.00$10,100.00$252.00$25,452.00
2575.519DISK ANCHORINGACRE42.4$50.00$2,120.00$50.00$2,120.00$63.00$2,671.20
2575.523EROSION CONTROL BLANKETS CATEGORY 1S Y122,720$0.85$104,312.00$0.80$98,176.00$0.73$89,585.60
2575.525EROSION STABILIZATION MAT CLASS 5S Y1,848$12.00$22,176.00$20.00$36,960.00$18.50$34,188.00
2575.532FERTILIZER TYPE 2LB1,999$0.65$1,299.35$0.50$999.50$1.00$1,999.00
2575.532FERTILIZER TYPE 1LB20,284$0.65$13,184.60$0.50$10,142.00$0.60$12,170.40
2582.501PAVT MSSG (RT ARROW) PAINTEACH12$70.00$840.00$70.00$840.00$75.00$900.00
2582.501PAVT MSSG (LT ARROW) PAINTEACH12$70.00$840.00$70.00$840.00$75.00$900.00
2582.5026" SOLID LINE WHITE-PAINTL F21,009$0.10$2,100.90$0.12$2,521.08$0.11$2,310.99
2582.50224" STOP LINE WHITE-PAINTL F216$2.50$540.00$2.50$540.00$2.65$572.40
2582.5024" SOLID LINE WHITE-PAINTL F4,312$0.09$388.08$0.10$431.20$0.10$431.20
2582.5028" DOTTED LINE WHITE-PAINTL F50$2.00$100.00$2.00$100.00$2.10$105.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTL F10,231$0.18$1,841.58$0.20$2,046.20$0.20$2,046.20
2582.50224" SOLID LINE YELLOW-PAINTL F342$2.00$684.00$2.00$684.00$2.10$718.20
2582.5024" SOLID LINE YELLOW-PAINTL F3,900$0.09$351.00$0.10$390.00$0.10$390.00
2582.503CROSSWALK MARKING-PAINTS F144$2.25$324.00$2.25$324.00$2.40$345.60
2582.603TEMPORARY LANE MARKINGLF14,543$0.64$9,307.52$0.70$10,180.10$0.70$10,180.10
 Totals for project 108366 (SP 010-611-006) $6,521,186.81 $6,649,370.06 $8,470,589.77
 
Contract Total:$6,521,186.81$6,649,370.06$8,470,589.77